UAE-based developer, Azizi Developments, has announced construction updates for all four phases of its upcoming flagship project in Meydan One, Azizi Riviera.
The progress of the project is advancing steadily and the developer has announced that for Phase 1 and 2, the majority of the buildings have reached the ground floor and are progressing rapidly with on-going superstructure works.
As for Phase 3, basement work has started and the foundations are progressing rapidly. Finally, for the last phase – Phase 4 contracts have been awarded for the full phase and construction is expected to commence end of July 2018.
Mirwais Azizi, chairman of Azizi Group, said: Azizi Riviera continues to be one of the most unique waterfront residential developments in Dubai. We are proud to confirm that it is progressing steadily according to schedule. With this project in particular, we aim to transform the real estate landscape in Dubai. A stunning French Mediterranean design with plenty of amenities, a community-oriented lifestyle and views of the Dubai Canal and Dubai skyline guarantee sizeable returns for residents and investors alike.
Azizi Riviera is the flagship project of Azizi Developments and the architecture, while drawing inspiration from the French Riviera lifestyle, will also contain versatile, contemporary elements.
A key feature of the Azizi Riviera development is a mega integrated retail district, which will consist of high-street bridge brands, leisure and entertainment options. The development, on the banks of the Dubai Canal, will also offer access to long paved pedestrian paths and water transport, yachting facilities and a proposed marina, among other attractions.