Azizi Developments, a leading private developer in the UAE, has revealed the standing of construction and infrastructure work in Mohammed bin Rashid City’s new landmark destination, Riviera. The first phase of the development now stands at 60%, phase two at 37%, and phase 3 at 22%, while the master developer is making substantial progress in the building of roads, sidewalks, drainage and water systems, backfilling, the laying of telephone line cables and more.
Mohamed Ragheb, Executive Director – Engineering Division at Azizi Developments, said: “It is truly a rewarding sight to behold. Riviera is our pride and joy – seeing it come to life, from its design stage to it now turning into a liveable city that will enhance lifestyles for generations to come, fills us all with immense excitement.”
Recently, Property Monitor reported that in 2019, MBR City had experienced the highest sales volume of residential apartments in Dubai, with 3,361 units sold, surpassing all other major areas and making it the most sought-after residential destination in the city.
Riviera, a stylish waterfront-lifestyle destination located in the heart of MBR City, is planned to comprise 71 mid-rise buildings with approximately 16,000 residences upon its completion that are conveniently located in the midst of all the business, leisure and retail hubs of the city. Designed to introduce the French-Mediterranean lifestyle to Dubai, which is not merely about architectural art but also about a certain ‘joie de vivre’ — a celebration of life, an exultation of spirit, Riviera represents a new landmark.
The homes offer spectacular views of the city’s skyline and ensure generous space, spread across three districts: an extensive retail boulevard, a canal walk with artisan eateries and boutiques, and Les Jardins — a lush-green social space.
The first phase of Riviera comprises 3,589 residences across 18 towers, consisting of 2,461 studios, 935 one-bedroom, 111 two-bedroom, and 82 three-bedroom units, most of which are projected to be completed in 2020. Phase 1 has a total built-up area of 375,541 sq. m and a total gross floor area of 180,854 sq m.