by Kasun Illankoon
Dawood Al Hajiri, Director General of Dubai Municipality on Thursday opened Al Lisaili Abattoir, which is set up with advanced equipment and tools. During the opening, he was briefed on the practices at the Abattoir, which will provide services to the residents of the region according to the highest standards in the field of work in the abattoirs.
The Al Lisaili Abattoir is in compliance with the green building requirements approved by Dubai Municipality. Environmental conservation systems were taken into account by reducing the thermal emission and a centralized system was followed for cleaning the slaughtering halls and thus reduced the use of cleaning equipment and materials in addition to reducing the effort of workers and water consumption.
The standards applied in the Abattoir include heating water using solar energy, which contributes to the rationalization of the expenses required for heating the water used in the slaughter halls by burning the fuel. There is a hand sterilization and shoe cleaning station at the entrance to the hall equipped with sensors that do not allow workers to enter the hall without sterilization of hands and cleaning shoes.